CLOSE

Your Details

CLOSE

Newsroom

Press Release
Back to all news
November 2, 2021

Fleet Space Announces 1 Year ExoSphere by Fleet® Contract with Core Lithium

Core's Finniss project site (NT). Image credit: Core Lithium

“This new contract with Core Lithium marks a huge step forward, not just for our respective companies but for Australia’s entire mineral industry. Global demand for high-grade lithium is growing exponentially, driven by rapid developments in electric vehicles (EVs) and renewable energy storage. Core is at the forefront of developing this critical resource, through its flagship Finniss Project near Darwin.

We’re delighted that having proved so successful in its trials this year, our pioneering satellite-based technology, ExoSphere by Fleet®, will be fully deployed on Core’s tenements across the NT. This is a fantastic opportunity to support and accelerate Core’s vision to become a major lithium producer.” 

Matt Pearson, Co-Founder & Chief Exploration Officer, Fleet Space Technologies

Core is one of the first companies to embrace Fleet’s ExoSphere by Fleet® technology, and the first to use it successfully in lithium exploration. Core sees huge potential for ExoSphere by Fleet® to provide robust new targets and focus drilling into the most prospective areas. Core considers that ExoSphere by Fleet® is an innovative new approach to exploration and looks forward to continuing a successful partnership with Fleet Space.”

Andy Bennett, Exploration Manager, Core Lithium

Fleet Space Secures New Contract with Core Lithium

Fleet Space Technologies is delighted to announce a major new contract with Core Lithium. The 12-month agreement, signed 12th October by Fleet Space Co-Founder & CEO Flavia Tata Nardini and Gareth Manderson, CEO at Core Lithium.

The contract, which comes into effect in May 2023, will see Fleet’s pioneering satellite-based mineral exploration system, ExoSphere by Fleet®, deployed across Core’s tenements in the Northern Territory.

Core was also successful in applying for the co-funding of a tenement-wide deployment of ExoSphere by Fleet® at its Shoobridge Project in 2022, under round 15 of the Geophysics and Drilling Collaborations program.

This follows successful results of a collaborative trial between Core Lithium and Fleet Space Technologies at the BP33 prospect. In August 2022 the company jointly announced the successful conclusion of survey trials.

In a statement to the ASX (1st August 20223), Core Lithium described the results of the trial as ‘an outstanding success’, noting an ‘excellent correlation with the pegmatite body interpreted from drilling to depths in excess of 500m’ and stating that ‘a number of previously unknown targets have emerged – a major boost for exploration.’

Accelerating Lithium Exploration with ExoSphere by Fleet®

Core is using ExoSphere by Fleet® to accelerate its lithium exploration activities, in line with its vision to provide high-grade lithium for electric vehicle (EV) and renewable energy storage applications worldwide.

The successful discovery of lithium, cobalt, copper and nickel is therefore essential to the global transition to clean-air mobility. Global EV demand cannot be met unless the pace of discoveries dramatically increases. The World Economic Forum states that the world’s battery capacity must grow 40 times larger than today to meet capacity demands.

Developed by Fleet Space at its headquarters in Adelaide, Australia, ExoSphere by Fleet® is a pioneering exploration system that delivers detailed, 3D subsurface images in days rather than months required using conventional techniques.

An array of satellite-enabled geophones, called Geodes, use edge computing to analyse ambient seismic noise collected by Ambient Noise Tomography (ANT). Geodes are up to10 times more sensitive than existing nodal geophones, increasing both accuracy and depth of results. This data is then rapidly processed and transmitted through Fleet’s low power satellite network.

Crucially, what ExoSphere by Fleet® can do for Core, by enabling direct detection of pegmatites, is to increase the probability of success in drilling, resulting in less drilling, less cost, less time to discovery and less environmental disturbance.

The contract includes the Geodes, planning and deployment support, and real-time processing and delivery of 3D shear velocity models for one year.

You might also like

View all
Fleet Space 2024: A Journey Beyond the Frontier
Blog

Fleet Space 2024: A Journey Beyond the Frontier

Read more
Fleet Space Closes A$150M Series D with A$800M+ Valuation
Press Release

Fleet Space Closes A$150M Series D with A$800M+ Valuation

Read more
Fleet Space’s Centauri 6 Demonstrates Path to Sovereign Multi-Orbit SATCOM
Blog

Fleet Space’s Centauri 6 Demonstrates Path to Sovereign Multi-Orbit SATCOM

Read more